The Federal Government of Nigeria has rehabilitated the Lower Anambra Irrigation Project (LAIP) Water Pumping Station in Ifite-Ogwari, Ayamelum Local Government Area of Anambra State.
The rehabilitated facility, formerly under the Agricultural Transformation Agenda Support Program Phase One (ATASP-1), was formally transferred to another existing agency, the Anambra-Imo River Basin Development Authority (AIRBDA).
The development was marked by a handover ceremony attended by representatives from the federal and state governments, as both entities work towards an improved irrigation system for Anambra’s agriculture.
Speaking at the occasion, Dr. Mohammed Ibrahim Arabi, the National Programme Coordinator of ATASP-1, spoke on behalf of the Minister of Agriculture and Food Security, saying that the development was a big plus for modernized farming in Nigeria and a huge boost to dry-season farming.
ATASP-1 National Coordinator, Arabi, represented by the National Programme Civil Engineer, Engr. Usman Abdullahi said, “The restored irrigation scheme would enhance food production and support sustainable agriculture across the Anambra River Basin”.
Arabi added that more than 2,000 hectares of farmland have been rehabilitated. This enables farmers from the Omor community to cultivate year-round.
“For years, farmers relied heavily on rain-fed agriculture, which limited productivity and exposed them to climate-related risks. With this irrigation infrastructure now restored, farmers can undertake multiple planting cycles annually, improving both yields and incomes,” he said
ATASP-1 Acknowledges Anambra Government Support

The Zonal Program Coordinator of ATASP-1 Adani-Omor Zone, Dr. Romanus Egba, spoke at the event. He added that the FG’s rehabilitation includes restoring several irrigation pumps and repairing over 40 km of irrigation canals.
He acknowledged Anambra’s governor, Prof Chukwuma Soludo, for his extended support. His support includes providing a 5,000kVA transformer to power the plant in the area. He added that the pumping station has been a lifeline to the irrigation system in Anyamelum. Egba regretted that the facility had deteriorated over the years.
On behalf of AIRBDA, Senator Anosike received the rehabilitated facility. He commended ATASP-1 for the new lease of life it has given the facility. He promised to properly maintain the facility and ensure it serves the community diligently as intended.
Traditional rulers, about 200 farmers, and other stakeholders attended the event, adding to its pomp and pageantry.

