The Imo State Government is holding an inauguration ceremony for the highly anticipated Orashi Electricity Project in the Owerri Metropolis.
The Orashi Electricity Project is a state-backed initiative designed to rival the existing Enugu Electricity Distribution Company (EEDC) and take Imo state’s power generation to the next level.
Present at the inauguration are the Executive Governor of Imo State, Senator Hope Uzodimma, the Honourable Minister of Power, Adebayo Adelabu, and the Former Secretary-General of the Commonwealth, Chief Emeka Anyaoku.
Also present were the technical team and representatives of the Egyptian energy firm in partnership with the Orashi Electricity Company Limited.
The Orashi Electricity Project is a flagship component of the Light Up Imo initiative, designed to provide 24/7 power to the 27 Local Government Areas of Imo State. The project has transitioned from an idea to an active infrastructure rollout powered by a N190.4 billion allocation from the state’s 2026 budget.
The project is not a single plant but a multi-hub energy ecosystem featuring a 380MW Orashi Power gas-to-power facility that serves as the primary generation hub, and an existing 338MW Egbema power station, creating a combined regional capacity exceeding 700MW.
Speaking at the inauguration, Uzodimma thanked President Bola Ahmed Tinubu for approving the regulatory framework that made the project a reality. He stated that the inauguration of the first phase of the light Imo project is a befitting birthday present to the good people of Imo as they mark the 50th anniversary of the state’s creation.
Uzodimma reiterated that Imo State is moving from a generator-based economy to a consistent power supply, poised to support businesses and stimulate imo state’s local economy. He added that the Orashi electricity power project will be powered by the state’s massive gas reserves.
The Imo state governor stressed that energy is the foundation of the state’s plan to transition to a trillion-naira economy in 25 years.
” We are matching forward until every street in Imo state is electrocuted ” says Uzodimma
Concluding his speech, Uzodimma warned against vandalism and the irresponsible use of the state’s new power infrastructure. He urged imo residents to protect the new infrastructure jealously and ensure it lasts for the people and the next generation.
The Orashi Electricity project is the first state-backed power project to fully take shape in the eastern region. Abia State is also working on its own power structure, but it remains in the ideation stage at the moment.

